I have recently used In Out Solutions for 3 projects, including installation of 2 glass offices and a dry wall office in our Leeds building, and a full refurbishment of our Grade 1 Listed building in London. The latter was a particular challenge, notably with regard to access. Michael, of In Out Solutions proved his worth on numerous occasions, not least when every company barring In Out Solutions stated that access was not sufficient for 3.5m glazing panels to be brought into the building. As a key element of the design brief, it was imperative that floor to ceiling glass panels were installed. Michael was on site to orchestrate the delivery and installation which went without fault.
In Out Solutions always deliver; on time for meetings, excellent communication and clear, concise quotations and work specifications. A real pleasure to deal with.
thebigworld, Steven Bradford, Global Facilities Manager
Palladia, Alaina Dunne, Deputy Centre Manager
Ethos Corporate Finance Ltd, Chris Silverwood, Managing Director
LDC, Jayne Dunford, PA to John Swarbrick
In Out Solutions provided an efficient out of hours service when undertaking our office refurbishment with the minimum of disruption. Michael was very keen to ensure our requirements were met and the job completed to our satisfaction and was on site to oversee works to ensure our instructions were carried out. Furniture etc was returned to its original position and the office left neat and tidy for the following working day.